St. Mark’s Preschool project involved constructing a brand-new facility featuring four classrooms designed to accommodate up to 64 children, all arranged in an L-shaped layout that integrates an outdoor play courtyard. The initial phase required the demolition of an 1,800 square foot Before-Care/After-Care building, along with the existing basketball court and the staircase connecting the upper and lower campuses.
Subsequently, we built a new 4,800 square foot preschool, enhanced by a 7,100 square foot play area. A new basketball court was also created, along with a ramp linking the upper campus to the lower campus. Additionally, we constructed a staircase from the upper campus to the preschool yard, and another staircase and ramp leading from the basketball/preschool area to the lower playfield. To improve accessibility, we established new van-accessible parking spaces.
Location: Altadena, CA
Scope: Demolition of a before-care/after-care facility. Construction of a new preschool, play area, and basketball court
Client: San Gabriel Valley Development LLC
Completion: Winter 2025
Size: 11,900 SF
Categorized: All Projects, Education, Faith Based & Non-profit, Location, Project Type | Tags: ADA Compliance, Basketball Court Contractor
Relevant Projects















