Posts by Slater Builders Staff
Santa Teresita Cristo Rey Cottage
Cristo Rey Cottage is an assisted living facility located on the Carmelite Sisters’ Santa Teresita Campus. This project is a ground up, 2 story, 20,000 SF facility with amenities that include a complete kitchen, dining room, common areas, den, laundry room and nurse stations. Exterior amenities include a BBQ area with a canopy, planter boxes,…
Read MoreMemorialCare Medical Foundation, Medical Office Building – Rancho Mission Viejo
Ground-up construction of a medical office building located in Rancho Mission Viejo, CA. This project consisted of approximately 26,000 SF of core and shell construction for Memorial Care Medical Foundation. The scope of work includes a two-story concrete tilt-up building with all related utilities, landscaping and parking. The exterior of the project is clad in…
Read More3200 Market Place Center
Project consisted of an outdoor amenities upgrade to four garden style – Class A business offices located next to the Tustin Market Place. The four courtyard locations varied in design layout and included cast-in-place concrete paving, artificial turf, three (3) Kettal shade structures, three (3) pre-cast concrete bench seat walls, BBQ island, landscape lighting and…
Read MoreMemorialCare Medical Foundation – Primary Care Clinic – Tustin
This project for MemorialCare Medical Foundation was a tenant improvement of a 2,380 square foot medical office building in Tustin. The scope of the project included demolition of existing walls, ceilings, lighting, associated utilities and construction of new partitions, power/data, and ceiling per new layout. Associated electrical, mechanical and plumbing included as well.
Read More100 Spectrum Center Drive Outdoor Reinvestment
Project consisted of an amenities upgrade to a high profile – Class A office center outside of the Irvine Spectrum. These upgrades included cast-in-place concrete paving, cast-in-place faux wood concrete paving, two shade structures with integrated downlights and infrared heaters, new irrigation and landscaping throughout and new soil amendments.
Read MoreBlackstar Industrial – Desert Hot Springs
Building 1: New construction of a 60,320 sf pre-engineered metal building to accommodate 12 future tenants, including mechanical, electrical, plumbing provisions and structural building foundation. Also includes a guard station, site amenities, trash enclosure, generator enclosure, security and fire alarm system for the building and project site. Building 2: New construction of a 140,400 sf…
Read MoreAlicia Business Center
Exterior facelift of an existing shopping center. Parking lot and accessibility upgrades and landscape improvements.
Read MoreBig Canyon Country Club Maintenance Facility
Construction of a new golf course maintenance facility that includes outdoor work areas, a 2-story 19,375 SF maintenance building, a 1-story 1,295 sf storage building and a 2,050 sf carport canopy. Site construction includes grading, paving, site drainage, chain link fences, CMU screen walls, CMU retaining walls, parking striping, and a carport canopy. Building construction…
Read More18800 Von Karman Tenant Improvement
Construction of a 14,416 SF office space with large vaulted ceilings. The space includes a custom metal interior wall glass system, multiple high end flooring options, black exposed spiral ductwork. Programming includes three restroom sets, three conference rooms, elevator refurbishment, and exterior concrete/landscaping enhancements.
Read MoreBalboa Yacht Club Renovations
At Balboa Yacht Club we did a lower level expansion across the entire basement area anywhere from 18” to 24” for them to have more usable rooms; we excavated 40’ below grade and installed caissons and steel for an added ‘88 locker’ below grade Locker Room under the East Courtyard area. We expanded the South…
Read More