Posts by Slater Builders Staff
Verbum Dei High School Weight Room
Project consisted of design build of MPE, including demolition of existing facility floors and walls, patch and repair of drywall, installation of new rubber sports flooring with school logo in the weight room, new epoxy flooring in the locker room, new VCT in the kitchen with cabinets and appliances, new paint and electrical fixtures throughout.
Read MorePavilion Park – Welcome Center & Greenhouse
Pavilion Park is a 5.9 acre park located in The Great Park in Irvine. Slater Builders teamed with ValleyCrest Landscape to design and deliver a unique blend of steel, concrete, stone, water features, and landscaping. The Welcome Center is surrounded by barbeques, outdoor fireplaces, heaters and water features. Pavilion Park includes a swimming pool and…
Read MoreSt. Paul High School
Renovation of four science labs, including a chemistry lab, biology lab, AP biology lab, science lecture classroom and auxiliary storage spaces. Scope included new millwork, countertops, emergency wash/shower stations, chemistry storage and hoods, fixtures, A/V and data systems, ADA improvements to the restrooms, HVAC system, new wall graphics, floating Tectum cloud ceilings, fans, lights, flooring…
Read MoreIslands Restaurants
Slater Builders completed the construction of several new ground-up restaurant buildings with adjacent site work. These projects included build out of custom finishes and coordination of kitchen equipment installations.
Read MoreSanta Teresita Good Shepherd Cottage
Good Shepherd Cottage is an assisted living facility located on the Carmelite Sisters’ Santa Teresita Campus. The two-story facility includes 22 resident rooms with a complete kitchen, dining room, living room, den, and laundry room on each floor along with a handicap accessible elevator to the second level. A vibrant garden including a built-in barbeque,…
Read MoreDisney Office Tenant Improvement
This project was a 25,000 SF tenant improvement build-out that included demolition of existing finishes, installation of a new fire sprinkler system, and 100% reducting of the HVAC system. The scope also included a complete gut and installation of four restroom facilities with shower stalls and employee kitchen, as well as minor parking lot work.
Read MoreWestcliff Plaza
Re-imaging of the outdoor dining area patio, painting of exterior retail buildings, new landscape and irrigation, new pavers and reconfiguration of the parking lot.
Read More
UCI Landscape Enhancement &
Mesa Court Units – Design/Build
UCI Landscape Enhancement: The prescriptive requirement of this project as directed by UCI was to design and construct a new entry plaza to the Claire Trevor School of Arts between the Scene Shop and Robert Cohen Theater. Slater Builders partnered with Valleycrest Design Group to develop an attractive, engaging and cohesive campus plaza with continuity…
Read MoreAmerican Rag & Café Beau Soleil
Slater Builders did the renovation of the American Rag-Café Beau Soleil and the Denim Bar at Fashion Island. The Café included a new entry with concrete stoop, new sliding pick-up window, new exterior fire rated drapes, new patio heaters and revised patio and bar lighting. The Denim Bar has a new entry with sliding wood…
Read MoreCanyon Restaurant & Reunion Kitchen and Drink
The Canyon Restaurant is a new high-end restaurant in an existing shopping center to serve as a center anchor. Premium finishes make this space appealing to diners throughout Anaheim Hills. With a keen eye for attention to detail, Slater Builders blended local artisans work with traditional construction methods to create a unique dining atmosphere. The…
Read More