St. Joseph Chapel Restoration
Restoration of the St. Joseph Chapel on the Santa Teresita Campus in Duarte, CA. The project included a reimagining of the chapel seating, new sound system, lighting, and alarms throughout, and upgrading the chapel to be ADA compliant. The scope also included a reimagining of the stain glass windows, a new tile dome, and marble…
Read MoreSt. Brendan’s School Multipurpose/Gym
The St. Brendan project consisted of the construction of a new two-story classroom building, new gymnasium building and upgrades to the fire and life safety systems in the existing two-story classroom building, along with new wet and dry utilities, perimeter masonry, and steel fences and new parking lot. The new buildings are masonry construction, totaling…
Read MoreSt. Mary’s Academy
The angel canopy was designed to predominately announce the field entrance of the school. Renovating the grand corridor gave openness to the central corridor and encourages student circulation. Along the student pick up and drop off location the wave canopy protects the students from sun and rain while surrounding them with green landscape and soft…
Read MoreSeventh Day Adventist High School
Slater Builders helped bring together the finished design for a new ground-up, two-story classroom building and new church meeting room building for the Seventh-day Adventist Church. The classroom building included a complete high school chemistry/biology laboratory along with classrooms and restrooms. The extensive civil site work consisted of fifty, 26 foot concrete cassions drilled into…
Read MoreThe District at Tustin Legacy
The District at Tustin Legacy consists of 100 acres with one million sq. ft. of prime retail center with shops and restaurants adjacent to the historical naval building hangers. Slater Builders, in partnership with Bayley Construction, managed the $72 million infrastructure including storm drain utilities, sewer, water, reclaimed water, electrical, gas, cabling, two miles of…
Read MoreParaclete High School
Construction consisted of a new two-story classroom building and attached multi-purpose gymnasium. The two-story, 17 classroom building also included a teachers’ workroom, restrooms, full gymnasium and full kitchen, as well as a design/build glass and glazing system, fire sprinkler and fire alarm systems and canopies. Extensive site work included re-routing of the existing underground utilities,…
Read MoreMount St. Mary’s Doheny & Chalon Campus’ Project
Located in the Adams Park Historical zone, the residence hall is house-scaled with 12,000 square feet, housing 47 beds and residential life offices. The third floor rooms are tucked under the sloping roof in the same manner as the neighboring houses. Students have access to the lounge, common living area, kitchenette, upstairs covered patio and…
Read MoreThe Square Irvine
The Square is a retail center located near John Wayne Airport in Irvine, California. This retail renovation was completed using a six stage phasing plan that provided for public access through the parking lot to the retail tenants during construction.
Read MoreCrystal Cove Promenade
Slater Builders completed three ground up, wood frame and stucco shell buildings for high-end retail and restaurant spaces for The Irvine Company including all associated sites at Crystal Cove Promenade.
Read MoreSt. Joachim Catholic School
This project consisted of the renovation and remodel of the church rectory, new construction of a two story classroom building and a multi-purpose/gymnasium building. All work was performed while campus, grades K-8 were in session. The convent renovation consisted of the refurbishing of 10 residential rooms, restrooms, meeting rooms and kitchen. The scope included new…