Posts by Slater Builders Staff
Bay Shores Peninsula Hotel
The Bay Shores Peninsula Hotel is located at the intersection of West Balboa Boulevard and 18th Street in Newport Beach, California. This prime spot lies adjacent to Marina Park and “Baby Beach,” conveniently positioned just a short distance from Newport Bay to the north and Newport Beach to the south. This project focused on converting…
Read MoreAscension Cemetery
Our expansion project for Ascension Cemetery in Lake Forest features a new maintenance building that spans 5,834 square feet, providing crucial space for operations and maintenance. Next to this, an equipment building of 1,860 square feet was constructed to store various machinery and tools. We also introduced two distinct family estates: the West Family Estates,…
Read MoreHonali Plaza
Honali Plaza involved the exterior renovation of façades for six buildings within an 85,000 square foot shopping plaza. This project emphasized improved energy efficiency through upgraded lighting, created an accessible pathway, and introduced a new courtyard and outdoor public space that includes lounges, a children’s play and dining area. Additionally, a new signage program was…
Read MoreSt. Barbara Catholic School
St. Barbara Catholic School located in Santa Ana was established in 1963 and was overdue for interior and exterior upgrades on two classroom buildings and the Parish Hall/Gym. The courtyard, signage screen, and structural upgrades were all completed in a Design Build role with Nous Engineering and Landcare Inc. The exterior of the campus buildings…
Read MoreSt. Anthony High School Renovations
The St. Anthony High School renovation project was the first of two phases to upgrade the main campus buildings and gym building. The work commenced with the gym where it received new insulation at the deck, new HVAC units, and fresh paint. The gym restrooms were upgraded along with the main entry way which included…
Read MoreGood Shepherd Cemetery
Phase 3 Expansion to Existing Cemetery in three areas: St. Vincent Pedestal Added new pedestal with niches for urn and cremated internment. Pedestal and niches are granite with Valori pre-cast caps. Existing marble St. Vincent statute placed on top of pedestal. Family Estates & St. Joseph Plaza 16 new family burial plots with 8 crypts…
Read MorePrivate Beach Club
This private Beach Club consisted of an existing 1 and 2 story Type V building originally constructed in 1923 and expanded through a number of additions throughout its history. Our expansion assignment consisted of constructing a 1-story + basement addition, renovation, and remodel with the following scope: Replacement of existing commercial kitchen serving on-site full-service…
Read MoreStarbucks – Vernon, CA
Shell building A included partial demolition of building, new interior and exterior wall and modified building lighting. Pad B included site demolition, site improvement, building shell with concrete slab, exterior building lighting, HVAC units, roof and wall insulation, roof drainage and plumbing.
Read MoreRAV Restaurant – Broad St. Oyster Company
Tenant Improvement for a new restaurant, Broad Street Oyster Co., in existing location on the Huntington Beach pier. Scope of interior work included demolition and improvements to the 1st and 2nd floors, order window and restrooms. Exterior scope included a new metal roof with LED lights.
Read More1641 Reynolds
A restoration tenant improvement project due to fire damage. Removal and replacement of 1st floor interior office, 2nd floor interior office and structure, panelized wood roof deck and roof framing, and a 17’-8” high entry window wall system. Removal and replacement of exterior entry sidewalk to comply with ADA accessibility slopes at main entry. New…
Read More